Ciclo Get in touch

What is planned

Where Ciclo stands today, the work that is scheduled next, and the things it is deliberately not going to do.

Where it stands

Parts, bills of materials, change orders and revisions work, and Ciclo has been moved onto the suite’s shared tenancy, design system and sign-in — a company, a member and an invitation now mean the same thing here as in the other three products.

Remaining work is about the rules a real engineering change process needs.

Planned work

What is being built

Grouped by theme and ordered by intent. These are horizons, not dates — nothing on this page is a delivery commitment, and the order can change when a customer gives us a reason to change it.

  • Next

    Change control that holds under concurrency

    A change order is a claim about what a product will be, and two engineers editing one at the same time must not be able to silently overwrite each other. This group makes the change process correct when more than one person is using it.

    • A change order’s part list that merges rather than replaces
    • One authoritative revision sequence, not two implementations of it
    • Part and change-order numbering that cannot collide under concurrent creates
    • Approval and promotion enforced server-side rather than in the client
  • Next

    Deviations that expire

    A temporary deviation from a bill of materials is only safe if it stops being valid. Today the expiry is recorded and nothing acts on it.

    • Deviation expiry actually enforced, not merely stored
    • Notice before a deviation lapses, to whoever owns the part
  • Later

    Administration across tenants

    Ciclo used to run on its own infrastructure with its own admin surface. Moving onto the shared platform retired that surface; rebuilding it on the platform is the remaining piece of the migration.

    • A cross-tenant administration surface on the shared platform
    • Decommissioning the legacy standalone project and its credentials

Out of scope

Not on the roadmap

Said plainly, because the alternative is a sales conversation that ends in disappointment. If one of these is the thing you need, Ciclo is not the product for it.

  • CAD file editing

    Ciclo manages the record of a part, not its geometry. Drawings attach; they are not authored here.

  • MRP and production scheduling

    A manufacturing system consumes Ciclo’s bill of materials. It is not the same product.

How this is maintained

Every item above corresponds to work tracked in our own issue tracker, and this page is rewritten from that tracker rather than kept by hand. What is not shown: unfixed defects and security work, which belong in the tracker until they are closed, not on a product page.

Want the detail behind a line on this page, or a view of where something sits? Write to dmoore@dwmmholdings.com and ask.

Next

Bring Ciclo into your company

Ask about onboarding an organisation, migrating existing records, or a demonstration.

This is a pre-production site. All content is subject to finalisation, and nothing stated here is binding until the site is live.